Main phases of repair in the house

Main phases of repair in the apartment.

How to start repair of the apartment?

The very first stage of the repair work of old houses is the destruction and taking apart to start with of the dilapidated walls and partition walls, eliminating the wall and ceiling covering. This stage is among the most "unclean" stages of the repair.

One more amongst the most crucial and "dusty" works is the window block replacement. It is necessary to do this to start with since dirt and dust will be unallowable during following phases and it is prohibited at all to open windows during painting and wallpaper works (big drops of the temperature level and moisture are unallowable). After installing windows and windowsills it is required to pack them instantly in polyethylene movie and to cover windowsills in addition by the fiber board (in order to prevent scratches).

The following stage is circuitry. Wiring can be set up in walls or along the floor. Wiring is made inside the pipes to ensure electrical security and boost dependability. The pipe secures wiring from external damages and permits to change the wire completely without breaking walls and floor just by inserting the brand-new wire instead of the old one.

House Painting follows the circuitry. The frequent error during the simultaneous conducting of such works takes place when workers forget to lay out one of the cables and home painters have actually currently plastered and smoothed out the wall. As an outcome, additional works are needed to seal chases on the completed wall. The places of the feed switch and wall outlet location and their number must be thought-out in advance. The plan of power electrical wiring is usually consisted of into the design project.

Later on the system need to be prepared to service in case of failures. In addition to the electrical wirings, the telephone cable television and the television cable television are set out. The power cable ought to not be set out near the telephone and antenna cable televisions to prevent sound pickup and disturbance. The most peculiar minute is laying out the television cable. In order to make 2 (or three) TV sets in the apartment the second cable television is often merely "firmly soldered" in parallel, so the cable television resistance is lowered. As an outcome, the display quality is deteriorated, many programs can't be received and etc. In order to avoid such situation it is essential to welcome an expert with unique devices. He will measure the signal level of the each TV-feeder and set up TV-amplifiers or TV-filters.

Painting is the most long-lasting process, that is why it is carried out concurrently in all facilities, if it is possible. Delays are related to the innovation. Each applied layer of the plaster (or filling out completing) must dry completely before the work will continue.

Works in hygienic arrangements and the kitchen area start all at once with home painting. It is much better to satisfy so-called "filthy" operate in the top place and simultaneously. In accordance with the plan of the hygienic technician place welding, wall chasing and pipe run are performed. Steam radiator admissions are prepared, taps and brackets are installed, but radiators are not installed.

Then works in hygienic plans are carried out according to the plan. The bath is installed, then walls are smoothed out and the tile is laid on walls. The following stage is assembling ceiling and laying tiles on the floor. And at last other hygienic gadgets, mixers and devices are mounted.

After circuitry, installation of rosette plates and terminal boxes the voltage is checked in all point. Ends of electrical wiring are insulated and set out into rosette plates. Sockets and breakers are not installed throughout this phase in order to conserve their surface appearance. The finish puttying of walls is carried out at the same time. The technically exact control of drying of the layer of the plaster (filling) is carried out by drymeter. It is a special instrument that determines moisture of the material.

The following phase is the procedure of fill. Fill can be made with different products-- from typical masonry cement-sand mix to self-aligning floorings. The advantage of the easy mix is its cheapness, the drawback is that such mix is much harder aligned at the level and the last dry time of such fill is 40 days, only then the next stage of the work with flooring can be carried out, i.e. the duration is too long. Self-leveling self-aligning floors are far more costly, but more technological. Aligning takes place practically "instantly" i.e. fluid option of mix is poured out, then it runs and you receive the horizontal surface area. The final dry time is 15 days i.e. you have significant time economy. The system "warm flooring" is installed into the fill. If the so-called "wet procedures" are inapplicable the technology of the dry aligning (the fill innovation) is used bases for floors with adjustable floor battens are mounted.

After fill door boxes and door are installed. Installation of doors need to take into the account thickness of future flooring covering. After setup the door can be taken off its hinges and removed till the end of repair work or loaded into polyethylene film to protect from https://www.fixitrightplumbing.com.au/plumber-hawthorn/ damages. Concurrently ceiling can be painted and the tile can be laid in that premises where it was planned. The tile needs to be laid on the absolutely dry overlay.

Finishing of the flooring installing depends upon the prepared covering. In most cases (if surface covering is not the tile) fill is covered by bitumen mastic and plywood sheets are laid. They are fixed to the flooring by self-tapping screws. One plywood sheet is repaired by 30-50 self-tapping screws to provide the close fixing of plywood and long-term service of the floor without squeak and bulging. The plywood offers the additional heat- and acoustic insulation. After installing of the plywood is completed, wallpaper for painting can be pasted on walls.

In facilities where finish covering of the floor is laminated floor covering or parquet stockpile, the regular wallpapers are pasted (not for painting) in the very first place. Then the floor covering is mounted.

If surface covering of the floor is the block parquet, the parquet is laid in the first place, then it is scraped and covered by one layer of lacquer. After this the regular wall-papers are pasted and the parquet is covered by the rest layers of lacquer (depending upon the quality of the parquet and lacquer). The discussed effect is linked just with such scrambling procedure when the great quantity of dust is produced. In spite of the truth that great flooring mills are geared up with the vacuum cleaner, the sufficient amount of dust is sped up on surrounding topics consisting of walls. Dust is very acerbic and is severely cleaned off. That is why in order not to harm wallpapers, they are pasted after rushing and in order the parquet do not soak up the surplus wetness it is covered by the one layer of lacquer before wallpaper pasting.

After this the main works can be considered to be ended up. It is left just to set up the plinths, ornamental elements, breakers and sockets, drape holders, to hang doors, plant-bands and others.

In conclusion it is necessary to note that the sequence of works was noted in basic and can change depending upon the certain scenario-- the variety of rooms in facility, your resources, peculiarities of the building and construction of the multilevel facilities. It is based on sound judgment and every person capable of analysis can separately produce such a series.